EXPERIENCE ON INSTRUMENTATION & CONTROLS PROJECTS

 

 

The following is a listing of some Instrumentation and Control System Projects that we have successfully completed.

 

Please note that we are an Allen-Bradley certified systems integrator and our references and credentials can be verified by Dan McCarthy or Mark Michelson at 503-281-8888 the distributor of Allen-Bradley products, or by calling and talking to Dave Brownlow or Sharon Parker at the local Allen-Bradley office.

 

 

 

  1. Grants Pass Water Treatment Facility

 

Owner: City of Grants Pass

Contact name: Jason Canady

Telephone number: (541) 474-6353

 

Engineering Company: West Yost & Associates DRB Engineering

Contact name: Dan Brent

Telephone number: (541) 431-1280

 

Manufactures and equipment used for instrumentation and controls:

Milltronics – Level Transducers

Allen-Bradley – PLC5/05

                           Micrologix

                           RS View 32

 

The system included the following:

RF modems and Ethernet

20 PLC’s (150 digital and 50 analog I/O)

 

The contracted cost of instrumentation, controls, HMI and PLC programming, training, check out and start up, submittals and drawings of the telemetry SCADA systems: $260,000.

 

The duration of the project was 3 months and was completed in August 1999.

 

  

  1. Grants Pass Redwood and Darniel Pump Stations

 

Owner: City of Grants Pass

Contact name: Jason Canady

Telephone number: (541) 474-6353

 

Engineering Company: Parametrix

Contact name: Ray Nichol

Telephone number: (503) 863-5128

 

Manufactures and equipment used for instrumentation and controls:

Milltronics – Level Transducers, Ultrasonic levels, Ammeters, conductivity meters

Allen-Bradley – PLC5/05

Control panels             

RS View 32

 

The system included the following:

RF modems and Ethernet

2 PLC’s (150 digital and 50 analog I/O)

 

The contracted cost of instrumentation, controls, HMI and PLC programming, training, check out and start up, submittals and drawings of the telemetry SCADA systems: $228,000.

 

The duration of the project was 3 months and was completed in December 2000.

 

  1. Boeing – Portland Waste Water Treatment Facility

 

Owner: Boeing Company

Contact name: Mark Rauch

Telephone number: (503) 669-4023

 

Engineering Company: Boeing

Contact name: Mark Rauch

Telephone number: (541) 669-4023

 

Manufactures and equipment used for instrumentation and controls:

Milltronics – Level Transducers

Yokogawa – Mag meters, pressure transducers

Allen-Bradley – PLC5/40e

                           Wonderware

 

The system included the following:

Data Hyway Plus, Ethernet

2 PLC’s (300 digital and 80 analog I/O)

 

The contracted cost of instrumentation, controls, HMI and PLC programming, training, check out and start up, submittals and drawings of the telemetry SCADA systems: $220,000.

 

The duration of the project was 4 months and was completed in February 1999.

 

  1. City of Heppner

 

Name of plant: Heppner Water Facility

Owner:  City of Heppner

Contact Name:  Gary Marks

Telephone Number:  (541) 676-9618

 

Name of Engineer: Anderson Perry Associates

 

Manufacturer(s) and equipment used:

Brett Ross – Level transmitters

GE – 90/30 PLC

Wonderware – In Touch

 

The system included the following:

RS232, Bell modems

7 PLC’s

 

The contracted cost of instrumentation, control, telemetry, and SCADA system: $40,000.

 

  1. City of Silverton

 

Name of plant: Silverton Water Facility

Owner:  City of Silverton

Contact Name:  Steve Yoder

Telephone Number:  (503) 873-5439

 

Name of Engineer: City of Silverton

Contact Name: Richard J Barstad P.E.

Telephone number: (503) 873-8679

 

Manufacturer(s) and equipment used:

Drexel brook – Level control I-P transducers

Allen-Bradley – SLC 5/03

Wonderware – In Touch

 

The contracted cost of instrumentation, control, telemetry, and SCADA system: $35,000.

 

  1. Anderson Construction

 

Name of plant: Hewlett Packard Bldg 10-CP3, Corvallis, OR

Owner:  Hewlett Packard

Contact Name:  Wayne Miller

Telephone Number:  (541) 758-4800

 

Name of Engineer: Erich Rominger

Telephone number (415) 949-1300

 

Manufacturer(s) and equipment used:

Ryan Herco – Level Switches

GE – 90/30 PLC

Cimplicity

 

The system included the following:

Genius LAN Bus, Ethernet

 

The contracted cost of instrumentation, control, telemetry, and SCADA system: $45,000.

 

  1. City of Eagle Point

 

Name of plant: City of Eagle point

Owner:  City of Eagle point

Contact Name:  Gary Shepley

Telephone Number:  (

 

Name of Engineer: Taurus Power and Controls

Telephone number (503) 692-9004

 

Manufacturer(s) and equipment used:

Allen-Bradley PLC’s

Control Panels

RSView

 

The system included the following: (5 sites)

Programming, control panels, submittals, drawings, installation, and start up.

 

  1. Bear Creek Sanitary Services

 

Name of plant: Bear Creek Sanitary

Owner:  City of Phoenix

Contact Name:  Carl Tappert

Telephone Number:  (541) 535-5193

 

Name of Engineer: DRB engineering

Telephone number (415) 949-1300

 

Manufacturer(s) and equipment used:

Flow Dar flow and Level Switches

Allen-Bradley PLC's

RSView

 

The system included the following:( 10 telemetry sites)

 

9.      Lincoln city Pump station Upgrades

Owner:  City of Lincoln City

Contact Name: Terry Kingston

Telephone Number:  (541) 992-2143

Project Value:  $179,000

Name of Engineer: Ace

Telephone number (503) 626-2320

 

Manufacturer(s) and equipment used:

Allen-Bradley PLC’s, BSN cards, Remote I/O

RS logix 500

Complete retrofit of existing controls 2 pumping stations

Each station had to be operational in 3 weeks from start of work

Each station required:

3 ABB drives 150 HP

AB Micro logix 1500 controllers

Milltronics Ultrasonic level

Flygt floats

Sparling Magnetic Flow monitor

 

 

 

Instrumentation Projects in Progress

 

Name of plant:  Lake Oswego Water Filtration Plant

Owner:  City of Lake Oswego

Contact Name:  Henry Thomson

Telephone Number:  (503)

Project Value:  $325,000

Name of Engineer: Montgomery Watson

Telephone number (503)

 

Manufacturer(s) and equipment used:

Allen-Bradley PLC’s, BSN cards, Remote I/O

RS logix 500

RSView 32

RS Historian

 

The system included the following:

Completely Redundant PLC control using AB BSN Networked controls,

Redundant, fault tolerant HMI system with hot backup.

Complete controls for the new filtration system

6 Differential pressure transmitters, Rosemount

6 Badger Flow Tubes With Rosemount Flow transmitters

8 Milltronics Probe level Devices

8 Hach Turbidity meters

Pressure switches, Floats

 

 

Name of plant:  Monmoth Waste Water Treatment Plant

Owner:  City of Monmoth

Contact Name:  Gregg Mills Farnham Electric

Telephone Number: (503) 373-9677

 

Name of Engineer:  Whitker engineering Todd Whitiker

Telephone number (541) 838 4033

 

Manufacturer(s) and equipment used:

Milltronics Hydro Ranger ultrasonic level devices

Yogogawa Pressure transmitters

Flygt Level devices

 

The system included the following:

Controls and programming for a lagoon style waste water treatment plant.

Principal function to distribute partially treated water for farmland direct application. 

 

New controls at the City maintenance facility with telemetry via modem to 1 remote pump station and 1 remote control facility.

 

Name of plant:  Madras Waste Water Treatment Plant

Owner:  City of Madras

Contact Name:  Kevin Cox

Telephone Number:  (541) 758-4800

 

Name of Engineer: ACE engineering

Engineer: Wen Jou

Telephone number (503)

 

Manufacturer(s) and equipment used: (10 sites)

Allen-Bradley PLC’S

Allen-Bradley Panelviews

GE – 90/30 PLC

Cimplicity

 

The system included the following:

All engineering drawings, submittals, panel building, check out and start up of the entire system including, vendor packages

 

 

 